MY词语>英语词典>dam up翻译和用法

dam up

英 [dæm ʌp]

美 [dæm ʌp]

壅高;筑坝壅水;挡水

英英释义

verb

  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
    因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。
  • On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
    本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。
  • The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
    堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。
  • A typical mud-gravel structure can be seen at the Shuiqiuchi Pool dam, it was piled up by debris flow deposits, and its formation is not related to mountain falling.
    水湫池堰塞坝的沉积物具有典型的“泥砾”结构,在形态特征上属于粘性重力流的碎屑流堆积;
  • The dam body is mainly made up of dam shell, antiseepage, drainage, and protection slope.
    土石坝坝体主要由坝壳、防渗体、排水设备、护坡等组成。
  • Along with the development of the West Regions, West-East electricity transmission project, South-to-North Water Transfer project are under way, there are more and more constructions of high dam and giant reservoir coming up.
    随着西部大开发、西电东送以及南水北调等国家级大工程项目的开工建设,高坝大库的建设越来越多。
  • The major contents are as follows: ( 1) According to the conservation of energy theory and the heat transfer theory, the heat transfer model of dam leakage is set up through the combination with the conservation energy equation and the heat transfer equation.
    根据能量守恒原理、传热学理论,由能量平衡方程及热传导方程联合建立大坝渗漏传热模型。
  • The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.
    基于时间序列分解法建立大坝变形预测模型。
  • The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
    石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。
  • The concrete seepage place of water conservancy engineering seepage is difficult to determine. We use the throwing salt method analyze the dam seepage and put up the evidence to engineering design of danger control.
    水利工程渗漏一般较难准确确定具体渗漏部位.用投盐法分析大坝渗漏,可为工程除险加固设计提供依据。